SlopeSoarer.com  •  PO Box 2235  •  Crestline, CA  •  92325  •  (805) 403-2724  •  (909) 338-6095

SlopeSoarer.com

(placeholder)

Flow 3.5 Build Videos

Sherpa II Build Videos

Kaze Build

Kaze 40/55 Kit Inventory

Sherpa II Kit Inventory

Part 1 Wing Construction - A

Part 2 - Wing Construction - B

Part 3 - Covering the Wing - A

Part 4 - Covering the Wing - B

Part 5 - Cutting/Installing Elevons - A

Sherpa II Flight Video

Part 8 - Preparing the Fuse - A

Part 6 - Cutting/Installing Elevons - B

Part 7 - Cutting/Installing Elevons - C

Part 9 - Preparing the Fuse - B

Part 10 - Preparing the Fuse - C

Part 11 - Preparing the Fuse - D

Part 12 - Pre-Assembly

Part 13 - Installing Servos - A

Part 14 - Installing Servos - B

Part 15 - Installing Servos - C

Part 16 - Installing the Fuse - A

Part 17 - Installing the Fuse - B

(placeholder)

Pt. 1 - Gluing Wing Spars - A

Wing Construction

Pt. 2 - Gluing Wing Spars - B

Pt. 3 - Mating Wings - A

Pt. 4 - Mating Wings - B

Pt. 5 - Spackling the Wing

Pt. 6 - Sanding the Wing

Pt. 7 - Taping the Wing - A

Pt. 8 - Taping the Wing - B

Raptor Build

Pt. 1 - Spackling the Fuse - A

The Fuse

Pt. 2 - Spackling the Fuse - B

Pt. 3 - Finger Launch

Pt. 4 - Gooping the Fuse

Pt. 5 - Canopy Magnets

Covering

Pt. 1 - Covering the Stab

Pt. 2 - Covering the Elevons

Pt. 3 - Covering Wings - A

Pt. 4 - Covering Wings - B

Pt. 5 - Covering Wings - C

Installing Gear

Pt. 1 - Installing Elevons

Pt. 2 - Installing Servos - A

Pt. 3 - Installing Servos - B

Pt. 4 - Installing Servos - C

Pt. 5 - Pushrods/Horns - A

Pt. 6 - Pushrods/Horns - B

Pt. 7 - Installing Servo Covers

Final Assembly

Pt. 1 - Attaching the Wing - A

Pt. 2 - Attaching the Wing - B

Pt. 3 - Attaching the Wing - C

Pt. 4 - Vertical Stab

Pt. 5 - Installing Receiver

Pt. 6 - Everything Fits!

Some Final Thoughts

Raptor 36/48 Kit Inventory

Segway Kit Inventory

The following build clips are for the Kaze 40.  The build for the Raptor are very close to the Kaze build.  As a result, these clips cover both kits.  

These build clips for the Kaze 40 were done several years ago.  Some of the methods and materials have changed.  Click here to read the updates to the above build clips.

(placeholder)

Part 1 - Mating the Wings

Part 2 - Installing the Spar

Part 3 - Covering the Wing - A

Part 4 - Covering the Wing - B

Part 5 - Covering the Wing - C

Part 6 - Covering the Wing - D

Part 7 - Fuse - Installing Gear - A

Part 8 - Fuse - Installing Gear - B

Part 9 - Fuse - Installing Gear - C

Part 10 - Fuse - Installing Gear - D

Part 11 - Fuse - Installing Gear - E

Part 12 - Fuse - Installing Gear - F

Part 13 - Fuse - Installing Gear - G

Part 14 - Fuse - Sanding - Spackling - A

Part 15 - Fuse - Sanding - Spackling - B

Part 16 - Fuse - Covering - A

Part 17 - Fuse - Covering - B

Part 18 - Fuse - Covering - C

Please note that the build videos for the Flow have been recorded at a lower quality in order to have them load faster and so they will appear more clearly on handheld devices.

Part 19 - Mad Mechanism - A

Part 20 - Mad Mechanism - B

Part 21 - Mad Mechanism - C

Part 22 - Mad Mechanism - D

Part 23 - Mad Mechanism - E

Part 24 - Mad Mechanism - F

Part 25 - Covering Elevator

Part 26 - Stab - A

Part 27 - Stab - B

Part 28 - Stab - C

Part 30 - Stab - E

Part 29 - Stab - D

Part 31 - Rudder - A

Part 32 - Rudder - B

Part 33 - Rudder - C

Part 34 - Ailerons - A

Part 35 - Ailerons - B

Part 36 - Ailerons - C

Part 37 - Ailerons - D

Part 38 - Alieron Servos - A

Part 39 - Alieron Servos - B

Part 40 - Elevator Servo

Part 41 - Rudder Servo

Part 42 - Attaching Elevator

Part 43 - Stringing Elevator - A

Part 44 - Stringing Elevator - B

Part 45 - Stringing Elevator - C

Part 46 - Rudder Installation - A

Part 47 - Rudder Installation - B

Part 48 - Wing Install - A

Part 49 - Wing Install - B

Part 50 - Wing Install - C

AUW/CG Video

Programming the Transmitter